Ongoing Projects

Detail Design Services

Description

Length (Km)

Client

4-laning of Aligarh-Kanpur section from Km 229.000 (Design Chainage 240.897) to Km 289.000 (Design Chainage 302.108) (Package-III from Kalyanpur- Naviganj) of NH-91 in the state of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana. Project Cost (1357 Cr)

61.22

Apco

“Up-gradation to two lane with paved shoulder configuration from undal to Jhadol (section of NH-58e), from km. 0+000 to km. 43+900 (design hainage), package-i, in the state of Rajasthan

43.90

HG Infra

Rehabilitation & Upgradation of Pachore–Shujalpur Road from Km 2+700 to Km 33+000 & White Topping (inside Pachore and Shujalpur city around which bypass has been proposed in Length of Km 9.61) on Pachore to Shujalpur section of Newly declared NH-752 Cin the State of Madhya Pradesh on EPC mode”.

39.91

Montecarlo-BECPL-JV

4- Lanne project Highway Comprises the section of NH-87, from Km 42.791 (Design Chainage Km 43.446) to Km 88.00 ( Design Chainage Km 93.226) ( Package- II) Rampur Kathgodam in the state of Uttarkhand .

49.78

Sadbhav Engineering Ltd.

Rehabilitation and augmentation of New NH-354 of section Khemkaran town to Start of Amritsar bypass from Design Chainage km 22.673 to km 71.496 or Length of 48.823 km under Bharatmala scheme in the state of Punjab on EPC Mode (Pkg-II)

48.83

Ceigall – IMC JV

Strengthening and Widening / Reconstruction of Chatterpur - Japla Road to Two lane with pave shoulder on EPC Mode.

33.00

Barbrik Projects Limited

Construction of Connectivity between Northern Mahipalpur bypass Road,NH8 and Northern Access Road from Airport near Hanuman Mandir SH: C/o main Underpass crossing NH-8, Bridge near utility area of Airport and Flyover at Junction of Mehrauli- Mahipalpur Bypass Road along with Grade Separators at other locations, Loops, Ramps, Footpath, Road Work including Road Signage, Road/Street Lighting works, drainage, rain water harvesting etc

Junction Improvement

Gawar Constructions Ltd

4 -laning of Chutmalpur-Ganeshpur section of NH-73 Gagalheri to Saharanpur section from Chainage 35.00 to 86 Highway.

51.00

Gawar

Up-gradation of Mansar- Ramtek-Salaikhurd, from existing km 75+800 (Mansar) to km 120+100 (Salaikhurd) [Design km.0.000 to km.44.000] (44.000 km)ofNH-753 to Two lane with paved shoulder configuration in the state of Maharashtra on EPC mode”.

44.00

Barbrik Projects Limited

Up-gradation Of Salaikhurd- Nawegaon-Tirora, From Existing Km 120+100 (Salaikhurd) To Km 163+200 (Tirora) [Design Km. 44.000 To Km. 87.000] Excluding 0.80 Km. Length From Km. 58+700 To Km. 59+500 (ROB At Tumsar) (42.200 Km) of NH- 753 To Two Lane With Paved Shoulder configuration in the state of Maharashtra on EPC mode.

42.20

Barbrik Projects Limited

Project Management Consultancy

4 Lanning Gwalior to Jhansi from (Design Chainage-16.000 to 96.127) of NH-75 in th states of Madhya Pradesh/Uttar Pradesh, to a four lane divided configuration along with strengthening of existing two lanes.

90.13

KRC Infra Projects Pvt ltd (Palwal)

6 Lanning Dewas bypass from 0.00 km to 19.80 km in the state of Madhya Pradesh. (BOT ROAD PROJECT)

19.80

K N Devlopers & Buildcon Pvt Ltd.

Prepration of Detail Project Report for Widening and Upgradation of Road from Hero Honda Chowk to SPR Junction Near Bassai Village in Gurgaon Haryana (In Association with KY Consultants Pvt Ltd)

5.50

Muncipal Corporation Gurgaon

Prepration of Detail Project Report for Widening and Upgradation of Railway Road from Rajiv Chowk Chowk to Gurugram Gurgaon Railway Station in Gurgaon Haryana (In Association with KY Consultants Pvt Ltd)

9.00

Muncipal Corporation Gurgaon

Prepration of Feasibility Study of Junction Improovment (Flyover/Underpass's) at Palla Chowk, Kherigaon Chowk, Sec 29 Chowk in Faridabad Haryana (In Association with KY Consultants Pvt Ltd)

3.50

Muncipal Corporation Gurgaon

Prepration of Detail Project Report for Widening and Upgradation of Chauma Road from Rajendera Chowk toDelhi Gurugram Border near Sector 112 in Gurgaon Haryana (In Association with KY Consultants Pvt Ltd)

6.50

Muncipal Corporation Gurgaon

Pre Tender Services

Four Laning of Gandhigram (Godda) to Hansdiha section of NH-133 from Km 50.800 to Km 95.770 in the State of Jharkhand on EPC Mode.

44.90

Gannon & Dunkerley Company Ltd

4-laning Section from Km. 1.700 (Pirpaiti of NH-80) in the State of Bihar to Km. 50.800 (Gandhigram, Godda of NH-133) in the State of Jharkhand on EPC mode.

49.10

Gannon & Dunkerley Ltd

4-laning of Aligarh-Kanpur section from Km 229.000 (Design Chainage km 240.897) to Km 289.000 (Design Chainage km 302.108) (Package-III from Kalyanpur- Naviganj) of NH-91 in the state of Uttar Pradesh on Hybrid Annuity Mode under Bharatmala Pariyojana

61.21

Apco Infratech Pvt Ltd

Four laning of Sangli-Solapur (Package-IV: Mangalwedha to Solapur) Section of NH-166 from existing Ch. km. 314.969 to Ch. 370.452 (Design Ch. km. 321.600 to km. 378.100) of length 56.500 km in the state of Maharashtra on Hybrid Annuity Mode

56.50

Apco Infratech Pvt Ltd

Rehabilitation and upgradation of 2 lane road with paved shoulders of mangrulpir to mahan (nh 161 a from 97/074 to 64/574 ) [design km. 75/000 to km. 107/500] (total length = 32.5 km) in the state of maharashtra

61.80

Arcons Infrastructures & Constructions Pvt. Ltd.

Rehabilitation and upgradation of mahan to akola (nh 161a from 64.574 to 35.265) [design km. 107/500 to km. 136/809] (total length = 29.309 km) in the state of maharashtra.

61.80

Arcons Infrastructures & Constructions Pvt. Ltd.

Up-gradation of Wardha – Arvi from km 0+000 (Wardha) to km 53+708 (Arvi) to Two Lane with paved shoulders in the state of Maharashtra

67.40

Arcons Infrastructures & Constructions Pvt. Ltd.

Rehabilitation and upgradation of existing carriageway to two lanes with paved shoulder standards in Arvi to Talegaon section of NH – 347A from km 99/700 to km 86/000 on EPC mode in the State of Maharashtra

67.40

Arcons Infrastructures & Constructions Pvt. Ltd.

Upgradation to 4 lane with paved shoulder of Bhimasar Junction of NH-41 to Anjar-Bhuj up to Airport Junction from km 0.000 to km 65.478 of NH-341 to be executed on Hybrid Annuity Mode in the state of Gujarat

65.47

Monte Carlo Ltd